Construction Priority
Level |
North Area Alternative Education Career Programs |
Present |
Future Planning |
1 |
Location |
N/A |
- Need location in North County
|
Program |
“ |
- Behavior & Voluntary Programs
|
Construction/Facility Needs |
“ |
|
Enrollment (February 2010) |
“ |
|
Construction Priority
Level |
Roosevelt Full Service Center |
Current |
Future Planning |
1 |
Location |
- 1601 Tamarind Ave., WPB, FL 33407
|
- Relocate to Inlet Grove in Riviera Beach
|
Program |
- 9 – 12 Academics
- Voluntary Academic
- Sheet Metal Program is housed there mainly for evening use
|
- 9 – 12 Academics
- Medical Program with Internships in hospitals
- Offer vocational program
- Culinary Program to feed the community
- Voluntary Placement
- Transition program (formerly DBI) will all be housed at Inlet Grove
|
Construction/Facility Needs |
- ADA
- Now do pull-out to computer labs
|
- Combination of computer & instruction in classroom
|
Community Concerns & Preferences |
- Great sense of community pride
- Class of ’57 would like greater involvement
|
- N/A - New location
- Provide access to school – computer labs, media center, cafeteria and gym.
|
Other |
|
- Need to develope long term plans for former RFSC campus
|
Enrollment (February 2010) |
75 |
|
| |
Website: Roosevelt Full Service Center |
|
Construction Priority
Level |
Intensive Transition - South |
Current |
Future Planning |
5 |
Location |
- 1509 Barton Rd., Lake Worth, FL 33460
|
- Revisit moving to “former” Plumosa campus after it holding school use is completed in 2013, demolishing the portables at South Transition and using it for a pre-school
|
Program |
|
- Very much need such services in South Area
- 6 – 12
- Consider adding an academic voluntary component if location is moved
- Look @ adding a Substance Abuse Youth Services program to serve south area.
|
Construction/Facility Needs |
- Old portable buildings are less functional
|
- Single unit building would be a more effective design
|
Enrollment (February 2010) |
81 |
|
Construction Priority
Level |
Gold Coast Community School |
Present |
Future Planning |
3 |
Location |
- 4260 Westgate Ave., West Palm Beach, FL 33409
|
- Seen as a viable long-term site for voluntary Alternative Ed
|
Program |
- Transition program for non-native students (adults)
- Elementary Behavior Transition Program
- Elementary, Middle and 9th Grade
- Teen Parent (only program with babies available in the County)
- Voluntary Alternative Ed Academics, Athletics & Drums
- Less than 200 students
|
- All alternative schools could do well with “hands-on” activities/programs
- Transition Program may really be needed with influx of Haitian students
- Retain Teen Parent Program, as it is very effective
- Increase focus on Middle School grades – Career/vocational/technology programs
|
Program |
- Pre-K teachers & after school programming moving into modulars
|
|
Construction/Facility Needs |
- Facility is antiquated
- ADA
|
- Replacement of buildings & addition of athletic facilities
- Need ADA Enhancements (elevators, etc.)
|
Enrollment (February 2010) |
140 |
|
| |
Website: Gold Coast Community School |
Construction Priority
Level |
Crossroads Academy |
Present |
Future Planning |
5 |
Location
|
- 225 SW 12th Street, Belle Glade, FL 33430
|
|
Program |
- 6 – 12
- Behavior ("Intensive Transition") West Elementary & Voluntary Academic Programs
|
- Would benefit from a career certificate program of some type
- Will have "Transition" program fka (DBI)
|
Construction/Facility Needs |
|
|
Enrollment (February 2010) |
170 |
|
| |
Website: Crossroads Academy |
Construction Priority
Level |
Turning Points Academy |
Present |
Future Planning |
5 |
Location |
- 1950 Benoist Farms Rd., West Palm Beach, FL 33411
|
|
Program |
|
- Could use some career certificate programs
|
Construction/Facility Needs |
|
|
Enrollment (February 2010) |
128 |
|
| |
Website: Turning Point Academy |
|
Construction Priority
Level |
West Tech Center |
Present |
Future Planning |
2 |
Location |
- 830 Larimore Rd, Pahokee, FL 33476
|
- See “Construction/Facility Needs”
|
Program |
- ATOSS, Facilities Services (FS) & Community College Lease
|
- Dual enrollment with area high schools & state colleges
- State college __ summer 2010, except Diesel
- Facilitate articulation into college programs
- Program must be fluid
- Technology will be key
- Incorporate Glades Master Plan
|
| |
Construction/Facility Needs |
|
- Move W. Area Office, ESE & Migrant Serv. To West Tech Campus
- Master Plan; Relocate & Consolidate FS w/W. Transportation
- Renovation
|
Enrollment (February 2010) |
N/A |
|
Construction Priority
Level |
North Area Vocational Center |
Present |
Future Planning |
1 |
Location |
|
- Inlet Grove will serve as the Facility
- See RFSC
|
Program |
|
|
Construction/Facility Needs |
|
|
Enrollment |
N/A |
|
Construction Priority
Level |
Palm Beach Juvenile Detention |
Present |
Future Planning |
N/A |
Location |
- 1100 45th St., Bldg. A, WPB, FL 33407
|
|
Program |
|
|
Construction/Facility Needs |
|
|
Enrollment |
70 |
|
Construction Priority
Level |
Highridge Family Center/Sabal Palm School |
Present |
Future Planning |
5 |
Location |
- 4200 N. Australian Ave., WPB, FL 33407
|
|
Program |
- Therapeutic Youth Services
- Cooperative Agreement w/County
- Shared compound w/P.B. County
|
|
Construction/Facility Needs |
|
- Ed Spec exists for desired changes (needs to be updated)
- Replace portables w/modulars & renovate other spaces
|
Enrollment (February 2010) |
46 |
|
Construction Priority
Level |
CARP |
Present |
Future Planning |
N/A |
Location |
- 5400 East Ave., WPB, FL 33407
|
|
Program |
|
|
| |
Construction/Facility Needs |
|
|
Enrollment (February 2010) |
6 |
|
Construction Priority
Level |
Eagle Youth Academy |
Present |
Future Planning |
N/A |
Location |
- 38800 State Rd. 80, Belle Glade, FL 33430
|
|
Program |
- 6 – 12
- Residential; operated by Sheriff w/District instructor
- Therapeutic Youth Services
|
- Contingent on Sheriff funding
|
Construction/Facility Needs |
- We owned but not the land modulars
|
- New modulars recently installed; project completed
|
Enrollment (February 2010) |
80 |
|
Construction Priority
Level |
Associate Marine Institute Kids, Inc. (AMIKids)
(pka PB Marine Institute) |
Present |
Future Planning |
N/A |
Location |
- Contracted with private provider
- Not our site; costly
|
|
Program |
- Boys & Girls
- 6 – 12
- Credit recovery in AM
- Hands-on, certificate program in PM
- DJJ Site
|
- Adjustments under consideration
|
Construction/Facility Needs |
- District does not owned facility
|
- Federal Government improve docks and rear area
|
Enrollment (February 2010) |
30 |
|
Construction Priority
Level |
Palm Beach Juvenile Correctional Facility |
Present |
Future Planning |
N/A |
Location |
- 9680 Fairgrounds Rd., WPB, FL 33411
|
|
Program |
- DJJ – District instructors; secondary
|
|
Construction/Facility Needs |
|
|
Enrollment (February 2010) |
103 |
|
Construction Priority
Level |
Palm Beach County Jail |
Present |
Future Planning |
N/A |
Location |
- 3228 Gun Club Rd., WPB, FL 33406
|
|
Program |
- District Instructor @ Jail
|
|
Construction/Facility Needs |
|
|
Enrollment (February 2010) |
80 |
|
Construction Priority
Level |
ATOSS – North |
Present |
Future Planning |
1 |
Location |
|
- Will be moved to Inlet Grove
|
Program |
|
|
Construction/Facility Needs |
- Location needed in Riviera Beach
|
- Will be moved to Inlet Grove
|
Enrollment (February 2010) |
|
- West Palm beach ATOSS needs a new location (Gains Park?
|
Construction Priority
Level |
|
Present |
Future Planning |
N/A |
Location |
- Boynton - St. John's Missionary Baptist
|
|
Program |
|
|
Construction/Facility Needs |
|
|
Enrollment (February 2010) |
|
|
Construction Priority
Level |
ATOSS – Central (WPB) |
Present |
Future Planning |
N/A |
Location |
|
- West Palm beach ATOSS needs a new location (Gains Park?
|
Program |
- Secondary
- Alternative to suspension
|
|
Construction/Facility Needs |
|
|
Enrollment (February 2010) |
|
|
Construction Priority
Level |
ATOSS – at West Tech |
Present |
Future Planning |
N/A |
Location |
West Tech |
|
Program |
- Secondary
- Alternative to suspension
|
|
Construction/Facility Needs |
|
|
Enrollment (February 2010) |
|
|
Construction Priority
Level |
ATOSS – West Central (Loxahatchee) |
Present |
Future Planning |
N/A |
Location |
|
|
Program |
- Secondary
- Alternative to suspension
|
|
Construction/Facility Needs |
|
|
Enrollment (February 2010) |
|
|
Construction Priority
Level |
PACE Center for Girls |
Present |
Future Planning |
N/A |
Location |
- 1225 D S. Military Trail, WPB, FL 33415
|
|
Program |
- Private provider
- Under DJJ supervision
- Voluntary or judicial placement academic/therapeutic
|
|
Construction/Facility Needs |
• Not District owned
- Not as large as desired; no room to expand
- Located in a strip mall
- Possible IAQ concern
|
- Completing expansion at the same site
|
Enrollment (February 2010) |
50 |
|
Construction Priority
Level |
Kelly Center |
Present |
Future Planning |
N/A |
Location |
- 1041 45th St., WPB, FL 33407
|
|
Program |
- Therapeutic Youth Service
|
|
Construction/Facility Needs |
- Facility not District Owned
|
|
Enrollment (February 2010) |
|
|