Division of Support Operations

Building Code Services

District Master Specifications 2013

The purpose of the District Master Spec is to standardize the construction of our schools as much as possible. It was developed with input from District Staff, outside Design Professionals, Vendors, and other interested stakeholders. It is also the District intent to amend the document annually. The District Staff will review all proposed amendments, and make appropriate changes to the base document on an annual basis, and release addendums as necessary.

It is not the District's intent to assume the responsibility or liability of the Design Professional to prepare the Construction Specifications for the project. It is our intent to aide in the development of the document and to provide a standard for our schools.

We therefore request the Design Professional use the District Master Spec as the base document and amend the document as required using the format outlined. That format is to strike through the items in the document not used in the project and underline anything added to the document. Only include sections related to the project, such as sections 13 34 16.1, 13 34 16.2, and 13 34 16.3 Grandstands and press box is not needed for an elementary or middle school.

 

The follow sections need input by the design professionals:

  • 01 11 00
  • 03 47 13
  • 11 65 00
  • 21 00 00
  • 32 93 00
  • 33 21 16

The design professional may submit a chart listing the District Master Specifications they plan to use as published on our web site in lieu of reprinting the documents.  In the chart, they can include the sections they are proposing to modify and submit only the modified specification documents with the strike through and underlines.  This chart must contain a statement that the design professional is agreeing to us the District Master Specifications with the modified sections as indicated.  Then sign and seal this document.

To save Word file, click on desired file select "Save As" from menu in Web browser. If Network password request comes up select cancel.

 

get_adobe_reader

Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 0 - Table of Contents
00 01 02 Table of Contents
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 1 - General Conditions
01 11 00 Summary of Work Contractor Conduct
01 50 00 Temporary Construction Facilities
01 26 00 Contract Modification Procedures
01 56 00 Security Barriers & Enclosures
01 29 76 Procedures for Payment
01 57 00 Temporary Controls
01 31 00 Project Management and Coordination
01 60 00 Material Equipment and Approved Equals
01 32 17 Network Analysis Schedules
01 72 29 Cutting and Patching
01 33 00 Submittals Procedures
01 75 00 Starting and Adjusting Systems
01 35 16 Alteration Projects Procedures
01 77 00 Contact Closeout
01 40 00 Quality Control
01 78 23 Operation & Maintenance Data
01 41 00 Regulatory Requirements
01 78 36 Warranties
01 45 00 Testing Laboratory Service
01 91 00 Commissioning
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 2 - Existing Conditions
02 41 13 Selective Demolition 02 41 16 Building Demolition
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 3 - Concrete
03 11 00 Concrete Formwork
03 36 00 Polished Concrete Floor Finishing
03 20 00 Concrete Reinforcement
03 41 00 Structural Precast Concrete
03 24 00 Fibrous Reinforcing
03 47 13 Tilt-up Concrete
03 30 00 Cast-in-place Concrete
03 52 16 Lightweight Insulating Concrete
03 35 00 Concrete Floor Finishing
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 4 - Masonry
04 05 13 Masonry Mortar & Grout
04 20 10 Reinforced Masonry Unit
04 20 00 Masonry Unit
04 23 00 Glass Unit Masonry
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 5 - Metals
05 12 00 Structural Steel
05 50 00 Metal Fabrications
05 21 00 Steel Joist & Joist Girders
05 51 00 Metal Stairs
05 31 00 Steel Deck
05 52 00 Metal Railings
05 40 00 Cold Formed Metal Framing
05 53 10 Metal Gratings & Floor Plates
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 6 - Woods, Plastics and Composites
06 10 00 Rough Carpentry
06 41 00 Custom Casework
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 7 - Thermal and Moisture Protection
07 01 50 Preparation for Reroofing
07 32 16 Concrete Roofing Tiles
07 11 13 Bituminous Dampproofing
07 42 13 Metal Wall Panel
07 13 00 Sheet Membrane Waterproofing
07 52 00 Modified Bitumen Membrane Roofing
07 14 00 Fluid Applied Waterproofing
07 61 13 Metal Roofing Panels
07 19 00 Water Repellent Penetrant
07 62 00 Flashing, Gutters, Downspouts, and Other Accessories
07 21 13 Polyisocyanorate Board Insulation
07 72 33 Roof Hatches
07 21 14 Extruded Polystyrene Board Insulation
07 81 16 Cementitious Fireproofing
07 21 16 Batt Insulation
07 84 00 Firestop Systems
07 21 19 Foamed-in-place Insulation
07 92 00 Joint Sealants
07 26 00 Vapor Retarders
07 95 13 Expansion Joint Cover Assemblies
07 31 13 Asphalt Shingles
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 8 - Openings
08 11 00 Metal Doors and Frames
08 33 26 Overhead Coiling Grilles
08 14 00 Wood Doors
08 51 13 Aluminum Windows
08 31 00 Access Doors and Frames
08 71 00 Door Hardware
08 33 13 Coiling Counter Doors
08 80 00 Glazing
08 33 23 Overhead Coiling Doors
08 91 19 Fixed Louvers
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 9 - Finishes
09 22 14 Metal Furring and Lathing
09 54 23 Linear Metal Ceiling
09 22 16 Non-Structural Metal Stud Framing
09 64 00 Wood Flooring
09 24 00 Portland Cement Plaster
09 65 00 Resilient Flooring
09 26 00 Veneer Plaster
09 68 13 Tile Carpet
09 26 13 Gypsum Veneer Plaster
09 84 33 Acoustical Wall Panels
09 29 00 Gypsum Board System
09 91 13 Exterior Painting
09 30 13 Ceramic and Quarry Tile
09 91 23 Interior Painting
09 51 00 Acoustical Ceilings
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 10 - Specialities
10 11 00 Marker Boards and Tack Boards
10 22 26 Operable Partitions
10 12 00 Display Cases
10 26 00 Door and Wall Protection
10 14 00 Signage
10 28 00 Toilet Accessories
10 14 16 Plaque
10 44 00 Fire Protection Specialties
10 14 33 Exterior Marquee Sign
10 51 00 General Corridor Lockers
10 14 63 Digital Exterior Marquee Sign
10 51 10 Athletic Lockers
10 21 00 Toilet Compartments
10 56 13 Metal Shelving
10 21 23 Cubicle Curtain
10 73 26 Walkway Coverings
10 22 13 Wire Mesh Partitions
10 75 00 Flagpoles
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 11 - Equipment
11 13 13 Loading Dock Bumpers
11 61 53 Stage Curtains
11 16 16 Safes
11 65 00 Athletic Equipment
11 31 00 Residential Appliances
11 66 53 Gymnasium Dividers
11 51 23 Library Stack Systems
11 95 05 Kilns
11 52 13 Projection Screens
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 12 - Furnishings
12 21 16 Vertical Louver Blinds
12 61 00 Fixed Auditorium Seating
12 35 53 Laboratory Casework & Equipment
12 66 00 Telescoping Bleachers
12 48 13 Entrance Floor Mats
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 13 - Special Construction
13 31 00 Playground Shade Structure
13 34 16.03 Modular Press Box
13 34 00 Fabricated Engineered Structures
13 34 16.04 Portable Exterior Bleachers
13 34 16.01 Home Side Grandstand Seating System
13 60 00 Spray Painting Booth
13 34 16.02 Visitor Side Aluminum Seating System
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 14 - Conveying Equipment
14 24 23 Hydraulic Elevators – Passenger
14 45 00 Automobile Lift System
14 42 13 Inclined Wheelchair Lift
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 21 - Fire Suppression
21 00 00 Fire Suppression
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 22 - Plumbing
22 05 00 Basic Plumbing Requirements
22 11 00 Facility Water Distribution
22 05 10 Minor Plumbing Demolition
22 13 00 Facility Sanitary Distribution
22 05 29 Hangers and Supports Plumbing Piping
22 14 00 Facility Storm Drainage
22 05 53 Id for Plumbing Piping & Equipment
22 20 00 Plumbing Specialties
22 05 93 Tests-Plumbing Piping Systems
22 30 00 Plumbing Equipment
22 07 19 Plumbing Piping Insulation
22 40 00 Plumbing Fixtures
22 10 00 Plumbing Piping
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33   (Top of Page)
Division 23 - Heating, Ventilation and Air-Conditioning (HVAC)
23 05 00 Basic Mechanical Requirements
23 23 00 Refrigeration Piping
23 05 10 Minor HVAC Demolition
23 25 00 HVAC Water Treatment
23 05 13 Motor Requirements for HVAC Equipment
23 29 23 Variable Frequency Motor Controls
23 05 19 Meters and Gages for HVAC Piping
23 31 00 Ductwork
23 05 29 Hangers & Supports for HVAC Piping
23 33 00 Air Duct Accessories
23 05 48 HVAC Vibration Control
23 34 23 HVAC Power Ventilators
23 05 53 Id for HVAC Piping and Equipment
23 36 16 Variable-Air-Volume Units
22 05 83 Tests-HVAC Piping Systems
23 37 13 Grilles, Registers, Diffusers
23 05 93 HVAC Testing, Adjusting and Balancing
23 40 00 HVAC Air Filters
23 07 13 Ductwork Insulation
23 63 13 Air Cooled Refrigerant Condensers
23 07 16 HVAC Equipment Insulation
23 64 10 Air Cooled Water Chillers
23 07 19 HVAC Piping Insulation
23 64 16 Centrifugal Water Chillers
23 08 00 Commissioning of HVAC Systems
23 64 26 Rotary Screw Water Chillers
23 09 00 Energy Management & Control System
23 65 00 Cooling Tower
23 21 13 Hydronic Piping
23 70 00 Air Handling Units
23 21 16 Hydronic Specialties
23 81 00 Decentralized HVAC Equipment
23 21 23 Hydronic Pumps
23 82 19 Electrical Resistance Duct Heaters
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 25 - Integrated Automation
25 50 00 Energy Management and Control System
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 26 - Electrical
26 00 00 Basic Electrical Requirements
26 27 16 Electrical Cabinets & Enclosures
26 05 00 Electrical Materials & Methods
26 27 23 Indoor Service Poles
26 05 13 Wires & Cables
26 27 26 Wiring Devices
26 05 19 Equipment Wiring Systems
26 28 13 Fuses (600 Volts & Below)
26 05 26 Grounding & Bonding for Electrical Systems
26 28 16 Enclosed Switches & Circuit Breakers
26 05 29 Hangers & Supports for Electrical Systems
26 28 39 Motor Controls
26 05 33 Electrical Raceways and Boxes
26 29 10 Electric Controls & Relays
26 05 36 Cable Trays (new)
26 35 13 Gas Engine Drive Generator Assembly
26 05 40 Electrical Connections of Relocatable Classrooms
26 36 00 Transfer Switches
26 05 53 Electrical Identification
26 41 00 Lightning Protection for Structures
26 08 00 Work Included
26 43 00 Transient Voltage Suppression
26 09 00 Electrical Instrumentation and Control
26 51 00 Interior Lighting
26 10 00 Electrical Utility Services
26 52 00 Emergency Lighting
26 22 10 Dry Type transformers
26 55 61 Theatrical Lighting
26 23 10 Disconnect Switches
26 56 29 Exterior Lighting
26 24 13 Switchboards
26 58 68 Exterior Athletic Lighting
26 24 16 Panelboards
 
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 27 - Communications
27 10 00 Communications Systems (Data & Voice)
27 51 23 Intercom System
27 24 10 Projector System
27 53 10 Emergency Radio Communication Systems
27 41 00 Master Antenna System (MAS)
27 53 13 GPS Wireless Clock System (new)
27 51 16 Public Address Systems (revised 2/24/2015)
27 60 00 Open Wiring
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 28 - Electronic Safety and Security
28 13 00 Access System
28 31 00 Fire Alarm & Smoke Detection Systems
28 16 00 Intrusion Detection
28 33 00 Video Surveillance System
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 31 - Earth Work
31 10 00 Site Clearing
31 31 16 Termite Control
31 20 00 Earth Moving
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 32 - Exterior Improvements
32 12 16 Asphalt Paving
32 18 23 Athletic Surfacing
32 13 13 Concrete Paving
32 30 00 Exterior Athletic Equipment and Field Markings
32 13 13.29 Pervious Concrete Pavement
32 31 13 Chain Link Fencing & Gates
32 14 13.19 Permeable Interlocking Concrete Pavement (new)
32 31 19 Decorative Metal Fencing & Gates
32 17 13 Parking Bumpers
32 84 23 Underground Irrigation System
32 17 23 Pavement Marking
32 92 23 Sodding
32 18 16.13 Artificial Turf Playground Protective Surfacing
32 93 00 Trees, Plants & Ground Cover
Jump to Division 0   1   2   3   4   5   6   7   8   9   10   11   12   13   14  21   22   23   25   26   27   28   31   32   33    (Top of Page)
Division 33 - Utilities
33 11 00 Water Distribution System
33 49 23 Cistern Systems
33 21 16 Irrigation Water Well
33 51 13 Gas Piping
33 30 00 Sanitary Sewerage Utilities
33 56 16 Underground LP Storage & Distribution